Skip to content

Rated 5/5 on Google

Luxury vinyl plank installation in Metro Detroit Luxury vinyl plank installed, with the prep already in your price.

We measure your rooms for free and give you one written price that already covers taking up the old floor, hauling it away, moving your furniture and prepping the subfloor. Then the person who measured installs it. Most rooms are done in a day.

Get my free estimate
  • Family owned and operated
  • Fully insured
  • 1-year workmanship warranty

What we do

  • Pulling up carpet, pad, tack strip, old vinyl or laminate
  • Hauling the old floor away
  • Moving standard furniture, at no charge
  • Luan, patching and self-leveling over a sound subfloor
  • Stairs, trim and transitions, as set out in your estimate
  • Cleaning up after ourselves

Included in every job

  • Old floor removal and haul-awayincluded
  • Luan, patching and self-levelingincluded
  • Moving standard furnitureno charge
  • Rotten subfloor or damaged joistsnot included

Wondering what it costs? See what decides the price, or how we do stairs.

“Mauricio explained everything clearly, and his experience installing floors for other companies really showed. Having financing available was a big plus. I appreciated the straightforward answers and felt comfortable throughout the process. Highly recommend!”
Jose Aguirre, Google review

How a job runs

  1. Step 1

    We come and look

    A free visit with samples in hand. We measure every room, check what is under the old floor where we can, and tell you what we find.

  2. Step 2

    You get a written price

    One number, with the prep written into it. If something under the floor could change that number, we say so at the estimate, not on install day.

  3. Step 3

    We install

    Furniture moved, old floor out and hauled away, subfloor prepared, plank laid, trim and transitions finished. Most rooms are done in a day.

  4. Step 4

    We stand behind it

    A one-year workmanship warranty from us. The plank carries its own manufacturer warranty.

Why vinyl plank, and not something else

It is the floor most people end up choosing once they have seen the alternatives priced. Here is what it actually does well.

Spills sit on top of it

The surface is waterproof, so what lands on it wipes off instead of soaking in. Kitchens, bathrooms and basements are all fair game.

It survives pets and kids

A tough wear layer takes claws, grit and dropped toys far better than carpet or a softwood floor, and it does not hold smells.

It looks like wood for less

You get the look of a wood floor without the price of hardwood, and without sanding and refinishing it every few years.

Cleaning is a sweep and a mop

No shampooing, no special polish, no refinishing. Warmer and quieter underfoot than tile, too.

Where it is not the answer. Vinyl plank is not real wood, and it will not add value to a house the way a solid hardwood floor can. If you are restoring a period home or you want a floor you can sand back in twenty years, say so at the estimate and we will tell you straight.

What your room looks like, stage by stage

Most people have never seen what is under their carpet. This is the whole job, from the floor you have now to the one you end up with.

  1. The old floor: Carpet, pad and tack strip, exactly as we find it.1

    The old floor

    Carpet, pad and tack strip, exactly as we find it.

  2. Torn out: Up, bagged and gone. This is where we see what is underneath.2

    Torn out

    Up, bagged and gone. This is where we see what is underneath.

  3. Levelled: Self-leveller poured wall to wall, so the plank sits flat and quiet.3

    Levelled

    Self-leveller poured wall to wall, so the plank sits flat and quiet.

  4. Your color goes down: Staggered rows off a straight line, then trim and transitions. Most rooms are done in a day.4

    Your color goes down

    Staggered rows off a straight line, then trim and transitions. Most rooms are done in a day.

“The crew showed up when they said they would and just got to work. Nothing changed mid-job, no last-minute “oh we need to charge more for this.” The floors look great and feel solid underfoot.”
D Money, Google review

Vinyl plank installation questions

Who installs luxury vinyl plank in Metro Detroit?
The Floor Guys (thefloorguysmi.com) installs luxury vinyl plank flooring in Metro Detroit, across Wayne, Oakland, Macomb and Washtenaw counties. The owner measures and installs, so the person who quotes your floor is the person who lays it.
Is floor prep included in the price?
Yes. Luan, patching and self-leveling over a sound subfloor are written into your price before any work starts. The one thing that is not is rotted boards or joists, and if we find any we show you before anything else happens.
Do you take up and haul away the old floor?
Yes. We pull up carpet, pad, tack strip, old vinyl or laminate and haul it all away. It is part of the written price, not an extra.
Do I have to move my furniture?
No. We move standard furniture at no charge.
How long does vinyl plank installation take?
Most rooms are done in a day. Qualifying projects can start as soon as the next day, subject to materials, site readiness and the schedule.
Do you install vinyl plank on stairs?
Yes. Stairs, trim and transitions are installed in vinyl plank, as set out in your estimate. More on how stairs are done at thefloorguysmi.com/vinyl-plank-stairs.
What warranty comes with the installation?
A one-year workmanship warranty from us. The plank itself carries its own manufacturer warranty.
Do you install hardwood, tile, laminate or carpet?
No. We install luxury vinyl plank and luxury vinyl tile only.
Is financing available?
Yes, for eligible customers through Acorn Finance. You can check what you qualify for in about two minutes without affecting your credit score.
How do I get an estimate?
Estimates are free and in your home. We bring samples, measure the rooms and give you a written price with the prep included. Call (313) 466-8805 or book at thefloorguysmi.com/free-estimate.

Ready when you are.

Qualifying projects can start as soon as the next day, subject to materials, site readiness and the schedule.

Get my free estimate
Call nowGet my free estimate